Door Hardware: Rules of Thumb

Anyone else struggle with door hardware? In my almost-7 years of working experience (and 4 years of college), I've never really had to assign it. Architects always did, while I checked all materials, heights, and frame types. 
I spy a panic bar! 
photo: King County Library
Recognizing there are several "acceptable" answers, but usually a "best," I am usually pretty frustrated when I get 3 of 4 hardware selections wrong or "not exact." I learned that the newer tests (since 2011) have really narrowed down correct answers. On my latest test, I only got 2 of 4 wrong, but I had to ask NCIDQ directly. Before clarifying with them, I had 3 of 4 wrong. Heck, I could have only 1 of 4 wrong... 

This isn't a memorization test, it's a test of application, knowledge, and creativity. Therefore we have to LEARN it rather than just memorize a fact and forget it 4 days later. 

{ NCIDQ Partition Rules of Thumb }

  • Rated partitions
    • Demising walls between tenant suites
    • Walls between tenant suite and public space/corridor (i.e. elevator lobby)
    • Walls between assembly spaces (>750 SF) and adjacent space or tenant corridor
    • Walls of a storage room >50 SF
  • Rated partitions must extend to the underside of the deck
  • Acoustical partitions must extend to the underside of the deck
  • Rated = acoustical 
  • Office-to-office or office-to-corridor extend to finished ceiling
  • I rarely see 4" Above Finished ceiling as a correct answer. I'm still not really sure why it's an option? Anyone know what instance this would be used (on the NCIDQ)?
{ NCIDQ Door Rules of Thumb }
  • Doors in a rated wall assembly (1-hour) must be a minimum 20 min. rating
  • Most door frames can be AL unless required otherwise
  • Doors are 7'-0" high and commonly 3'-0" wide with a few exceptions
  • When "visibility" is required, I like to use either minimal glazing on the door itself, or a frame type with a sidelight. Why? Because rated doors have limits on the amount of glazing. These limits vary per code. Most fire-rated glazing is actually 45-min which is greater than the 20-minute minimum required by NCIDQ.
  • I use SCW (solid core wood) doors throughout unless I have a storage or utility room. These are typically utilitarian with louvered vents or are completely solid-faced (but hollow on the inside) HMD (hollow metal doors). 
{ NCIDQ Hardware Rules of Thumb } 
  • Rated doors require a closer
  • "Controlled access" or "Secured" typically requires a Card Reader or a Code Lock
  • Assembly space >750 SF should have a closer and a Lever Passage set typically. A panic bar is also acceptable, but not required.
{ The What and Why of Door Hardware }
What is each set and where would we use it?